• About
  • Durians
  • Durian Plantations   
    • Kampung Sang Lee, Raub - 50 acres
    • Sungai Ruan, Raub - 4 acres
    • Sungai Ruan, Raub - 2 acres
    • Kampung Felda Sri Ledang, Tangkak, Johor - 24.5 acres
    • Kampung Gemeh, Tangkak, Johor - 25 acres
    • Semenyih, Jalan Sungai Lalang, Selangor - 10 acres
    • Semenyih (behind Semenyih Memorial Park) - 40 acres
    • Jalan Sungai Sala, Johol, N9 - 13.5 acres
    • Klinik Desa Betong, Johol, N9 - 59 acres
  • Services
  • Contact

Kampung Sang Lee, Raub – 50 acres
with 2-to-8-year-old trees







Musang King and Blackthorn Durian Farm



  • Main Road, Kampung Sang Lee (大路边)
  • 50.40 Acres (10 titles , Each title 5.04 acres) ,
  • Hilly Land 250 Meter Elevation,高山榴莲巴
  • Free Reserve Land Approx 4 acres inside the Land. 免费 4acre reserve 地
  • Freehold Land
  • 20 Minutes Drive from Bentong Town(20分钟离开Bentong)
  • Gated, With Zink, Fencing and comes With auto gate as well(篱笆维好了,有自动电门)
  • 3 phase electric pump, JBA water, Free Mountain Water and 2 x River inside the land (有政府水,有电,也有免费山水)
  • 5 acres of full grown Musang King and Black Thorn – 6 to 10 years (approx. 85 Trees)
  • 5 acre – 是有收成的地 大约 85 颗树是有收成的
  • 30% Blackthorn - Planting Distance 32 Feet
  • Approx : 700 BT Trees Aged 2 to 3 years
  • 70% Musang King – Planting Distance 35 Feet
  • Approx : 1500 Trees Aged 2 to 3 years
  • 100 Trees Newly planted, replacement age 1 year
  • TOTAL 2300 TREES (共2400 颗树)
  • Electric Water Pumps and Diesel Pump is Ready, Water tanks is ready, Fertilizer tanks is ready 浇水系统 100% 好了。
  • Cement road, drainage , main-hole and landslide prevention system completed. 洋灰路,垄沟,跑水系统完毕
  • 99% land completed planting, utilize the entire 50.4 acres 土地99% 种完了,不用补树, 地完全开发好了
  • 1 x Pond , 1 x Mountain water swimming Pool and 2 River running through the land (Never Dry) 有湖,有山水, 有河
  • 3 x workers hostel ( 3 个员工宿舍 )
  • By The main road, large enough to do a nitrogen freezing factory and cold room 大路边,可以起冷冻工厂, 也可以做收果站